DEMOLITION

Demolition of Entire Shower

Demo and Rid of Shower Tiles

Remove and Rid of Shower Fixtures and Trim

Demo and Rid of Glass Shower Door


PLUMBING

Replace and install new shower valve.

Wall mount pipes for head shower option.

Ceiling mount pipes for rain shower option. (Optional)

Installation of new shower pan hotmop to properly guide drainage and prevent any leaks.

Installation of shower heads.


ELECTRICAL

Relocate and install new exhaust vent. (If needed)

Installation of 4″ or 6” LED recessed light in shower.


INSULATION

Install new insulation if/where needed before closing walls with hardie backer board.


LEVELING

Level shower floor to prepare for proper drainage of water flow.


HARDIE BACKER

Install 0.5″ water resistant hardie backer board across new showerwalls.

Apply waterproof thin set for extra layer of protection against water leaks and mold.


TILING

Inlay of thin set and tiles on new shower walls, and shower floor, as well as shower niche and bench. (Custom bench can be included if requested by client).


GLASS

Installation of new frame-less shower glass door.

Shower guard can be purchased and included for an additional contractor price.